How many yards of concrete in a 30 x 40 slab

Web4 jan. 2011 · Study now. See answer (1) Best Answer. Copy. 11.852 cubic yards. Wiki User. ∙ 2011-01-04 15:56:11. This answer is: Study guides. Web20 jan. 2011 · Yards are for measuring length not volume. Cubic yards required will be as follows: 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet. Your concrete pad is 30ft …

How many bags of concrete do I need for a 10x10 slab?

WebThus, a 3,600-pound cubic yard contains about 800 pounds of cement, which comes out to 10 of the 80-pound bags of cement or 13.3 of the 60-pound bags. Pure cement, sand and crushed rock all have about the same density, so a block of pure cement measuring 1 cubic yard of volume (about 3,600 pounds) will contain 45 bags of cement. Advertisement. Web11 apr. 2024 · 33 x .037 = 1.22 cubic yards; Essentially you are solving for volume and then converting to cubic yards. For concrete, the formula for volume is as follows: length x width x thickness. To determine how many bags of concrete you will need, divide the total cubic … Now, most concrete stamps, or stamp mats, are molded from the real materials they … Concrete should not be placed when temperatures will drop below 20F. The … Find Stamped Contractors in your area offering decorative concrete services. … data link layer flow control https://digiest-media.com

Sonotube Calculator

WebHow Many 40 Pound Bags of Concrete in a Yard A 40-pound bag of concrete mix makes 0.3ft³ of concrete which would cover 3.6ft² to a thickness of 1”. A yard of concrete is 27ft³, so 27 ÷ 0.3ft³ = 90 bags. A 40-pound bag of 4000psi concrete mix costs between $2.78 and $2.88 in my area. Web9 jan. 2024 · A 30×40 concrete slab will cover 1200 square feet. One may need to spend $5.50- $9.50 per square foot; this would mean an estimated $6,600- $11,400. It is worth noting that this estimate depends on the following options: 3000 PSI Concrete: PSI is used to measure the compressive strength of concrete. WebAs per general practices, generally you will need 499 cubic feet or 18.49 yards of ready mix concrete for a 30×40 slab at 5 inches thick. Maths calculation:- 1) 30×40 = 1200 square … data link layer of the 7 layer osi model

How many bags of concrete do I need for a 10×12 slab - Civil Sir

Category:How Many Bags Of Concrete In A Yard? - Plasticine House

Tags:How many yards of concrete in a 30 x 40 slab

How many yards of concrete in a 30 x 40 slab

How many yards of concrete do I need for a 20×40 slab - Civil Sir

Web30 mrt. 2024 · The estimate of $4,800 to $9,600 for a 30×40 (1200 square feet) concrete slab is based on a project with the following options: Six inches of 3,000 PSI concrete A … Web26 mrt. 2015 · How many yards of concrete in a 24 x 30 slab? Wiki User ∙ 2015-03-26 15:58:54 Study now See answer (1) Best Answer Copy Assuming a thickness of four inches and allowing about 5% waste,...

How many yards of concrete in a 30 x 40 slab

Did you know?

WebAt 4 inches thickness, for a 40×50 slab, generally, you will need approximately 25 cubic yards or 660 cubic feet of concrete. At 5″ thickness of 40×50 slab, 31 cubic yards or 832 cubic feet of concrete will be necessary. At 6″ thickness of 40×50 slab, 37 cubic yards or 1000 cubic feet of concrete will be required. WebSo for your 576 sq ft area, this may roughly cost $322.56 for wire mesh, $1,728.00 for thicker wire rebar mesh and $74.88 for fiber mesh. *Reinforcing for 10 inch pours and under. How to Calculate Concrete Amount for 24x24 x6". 24 * 24 = 576 sq ft. 6 / 12 = 0.5 ft depth.

WebHow many bags of concrete do i need for a 10’× 20′ slab? As we know 40 pounds a bag of concrete yields 0.011 cubic yards, 60 pounds a bag of concrete yields 0.017 cubic yards and 80 pounds a bag of concrete yields 0.022 cubic yards. As per calculation you need 2.442 cubic yards of concrete for a 10’× 20′ slab of 4 inch thick. Web26 mrt. 2015 · How many yards of concrete in a 24 x 30 slab? Assuming a thickness of four inches and allowing about 5% waste, you would need 9.33 cubic yards or about 419 …

Web30 mrt. 2024 · You will need around one 25-kg bag of pre-mixed concrete to fill a foot height of an 8-inch Sonotube if you use 150 lb/ft³ concrete. To arrive at that bag number: Find the volume of a 1′ high 8" diameter column: Volume = π × (8 in)² × 12" / 4 = 603.2 in³ ≈ 0.3491 ft³ Calculate the equivalent weight of the column: Web7 jan. 2024 · To calculate the amount of concrete you need for a slab, you should find the cubic yardage of the area you will be filling. Just follow these steps: Measure the area in …

WebWith a brief look, a 30x40 area at 6 inches deep, you would need approximately 31.56 tons or 22.22 cubic yards of gravel. Concrete reinforcing is also recommended in high traffic …

WebConcrete equation ( (w x l) x (d / 12)) / 27 = cubic yard w = Width, l = length, d = depth Example Mr. Calculate needs a slab of concrete covering 20 feet by 20 feet at 6 inches deep. ( (20 x 20) x (6 / 12)) / 27 = 7.407 cubic yards Popular square footage areas 5x5 x6" 10x10 x6" 10x15 x6" 12x12 x6" 20x20 x6" 15x15 x6" 16x16 x6" 18x18 x6" 20x30 x6" bits and bobs magazineWebNo. of 40lb bags = 47.53/0.30 = 159 bags. How many bags concrete do i need for a 12×12 slab at 5 inches thick. At 5 inches thick, for a 12×12 slab you would need 2.22 cubic yards or 60 cubic feet of concrete. If you use premix concrete, either 100 80-Pound, 134 60-pound, 160 50-pound, or 200 40-pound bags of premixed concrete will be required. bits and bobs flippersWeb4 jan. 2024 · If you are currently building and wondering how many bags of concrete you will need to make a yard, check this instruction: Check the weight of the package of the … data link layer protocols in iotWebStep 2 :-converting cubic feet into cubic yard:- now converting into cubic yard, you should divide it by 27, so volume of concrete you needed for 40×60 slab at 4 inch thick in cubic … data link layer protocols listWebHowever, for a 40 ft (12.19 m) x 60 ft (18.29 m) concrete slab, the price may still go higher. Image Source: Home Guide Professionals recommend using precast concrete for your … bits and bobs legolandWeb11 okt. 2013 · 40 x 40 x 1/2 = 800 cubic feet. Divide 800 by 27 (27 cubic feet per yard) = approximately 29.6 yards.. round that up to 30 cubic yards of concrete. How many yards of cement... data link layer protocols چیستWeb1.2026 – 0.1336 = 1.069 cubic ft. per post. Then multiply by the number of posts to find the total amount of concrete needed for the project: 1.069 cubic ft × 20 posts = 21.38 cubic ft. Finally, convert it to cubic yards: 21.38 cubic ft. ÷ 27 = 0.79 cubic yards. Hint: you can also use a concrete calculator for this step. data link layer protocols types